Fast 9-patch for quilting practice; the fat quarter pack was too fun to pass up. Elizebeth Smith Friedman. View
All Posts
Not perfect — there are a few points that are cringe worthy — but not terrible. Not sure I
Really don’t understand how this shit spirals out of control every year. We built the perfect chord — again
Enough planning. Only 46″ of the primary orange — may as well let necessity lead. Setting to 9″ at
The dissonance is feverish. The initial plan was herringbone piecing with chevron mirroring. Currently leaning toward a modified arglye
Calculations complete, uploads begun; 3 days until quasi-normalcy returns. Still not putting enough planning and effort into the actual
Two days to deadline and burnout has hit at last; the last two months can fuck right off. Asymmetric
Pretty sure I can smell my synapses smoking; not much juice for projects. Raided the leftover patches to reinforce
Fake winter is messing with my rhythm. It’s supposed to be windy and grey and conducive to closing loops
2 sections down, 2 to go. Then to decide on a world map background. Might be a good time