Not perfect — there are a few points that are cringe worthy — but not terrible. Not sure I
Category: Quilt Making
Really don’t understand how this shit spirals out of control every year. We built the perfect chord — again
Enough planning. Only 46″ of the primary orange — may as well let necessity lead. Setting to 9″ at
The dissonance is feverish. The initial plan was herringbone piecing with chevron mirroring. Currently leaning toward a modified arglye
Calculations complete, uploads begun; 3 days until quasi-normalcy returns. Still not putting enough planning and effort into the actual
Two days to deadline and burnout has hit at last; the last two months can fuck right off. Asymmetric
2 sections down, 2 to go. Then to decide on a world map background. Might be a good time
Hardly perfect, but done. Resisting the urge to pull and hand-stitch the binding over two 1″ frays. Let. that.
Deadlines still trying to assassinate my ass, but the accountability train is mostly back on track. And I feel
Going to have to stop neglecting the quilting side of the equation at some point. For this point, freehand